Jæren Everk chooses our cable pusher to save time and costs
When Jæren Everk faced a demanding 1100 meter cable run, they chose to test a new method to avoid digging up the asphalt walkway.
Using Melbye's cable pusher, the team completed the run in a fraction of the expected time, saving both cost and disruption for the local community.
ArticlesRelated articles
Accelerating Energy Storage Infrastructure Across Sweden
Flexible foundation solutions helped accelerate the deployment of solar and battery storage systems while reducing installation complexity and project risk.
Read More arrow_right_altFire-rated optotubes and microtubes for safe indoor installations
In tunnels, hospitals, airports and other public environments, it is often the details behind the walls that determine how safe a building actually is in the event of a fire.
Read More arrow_right_altThe next generation of engineers on the road
When technology students build a solar car that will drive 3,000 kilometers through the Australian desert.
Read More arrow_right_altNeed help finding the right product?
Our experts are here to help you find the right solution for your project. Get in touch for product advice, support or a quote.
Get In Touch arrow_right_alt
Danish
Swedish
Norwegian
Finnish
English