search
close
  • Home
  • Case Studies
  • Jæren Everk chooses our cable pusher to save time and costs

Jæren Everk chooses our cable pusher to save time and costs

Jæren Everk chooses our cable pusher to save time and costs

When Jæren Everk faced a demanding 1100 meter cable run, they chose to test a new method to avoid digging up the asphalt walkway.

Using Melbye's cable pusher, the team completed the run in a fraction of the expected time, saving both cost and disruption for the local community.

We will get back to you!

Leave contact info arrow_right_alt

ArticlesRelated articles

Accelerating Energy Storage Infrastructure Across Sweden

Accelerating Energy Storage Infrastructure Across Sweden

Flexible foundation solutions helped accelerate the deployment of solar and battery storage systems while reducing installation complexity and project risk.

Read More arrow_right_alt
Fire-rated optotubes and microtubes for safe indoor installations

Fire-rated optotubes and microtubes for safe indoor installations

In tunnels, hospitals, airports and other public environments, it is often the details behind the walls that determine how safe a building actually is in the event of a fire.

Read More arrow_right_alt
The next generation of engineers on the road

The next generation of engineers on the road

When technology students build a solar car that will drive 3,000 kilometers through the Australian desert.

Read More arrow_right_alt

Need help finding the right product?

Our experts are here to help you find the right solution for your project. Get in touch for product advice, support or a quote.

Get In Touch arrow_right_alt
Loading…
Loading the web debug toolbar…
Attempt #