[da_DK] Jæren Everk chooses our cable pusher to save time and costs

[da_DK] Jæren Everk chooses our cable pusher to save time and costs

[da_DK]

When Jæren Everk faced a demanding 1100 meter cable run, they chose to test a new method to avoid digging up the asphalt walkway.

Using Melbye's cable pusher, the team completed the run in a fraction of the expected time, saving both cost and disruption for the local community.

We will get back to you!

Leave contact info arrow_right_alt

ArticlesRelated articles

[da_DK] Energy Storage for Commercial Buildings

[da_DK] Energy Storage for Commercial Buildings

[da_DK] Flexible foundation solutions helped accelerate the deployment of solar and battery storage systems while reducing installation complexity and project risk.

Read More arrow_right_alt
[da_DK] Fire-rated optotubes and microtubes for safe indoor installations

[da_DK] Fire-rated optotubes and microtubes for safe indoor installations

[da_DK] In tunnels, hospitals, airports and other public environments, it is often the details behind the walls that determine how safe a building actually is in the event of a fire.

Read More arrow_right_alt
[da_DK] The next generation of engineers on the road

[da_DK] The next generation of engineers on the road

[da_DK] When technology students build a solar car that will drive 3,000 kilometers through the Australian desert.

Read More arrow_right_alt

Need help finding the right product?

Our experts are here to help you find the right solution for your project. Get in touch for product advice, support or a quote.

Get In Touch arrow_right_alt
Loading…
Loading the web debug toolbar…
Attempt #