[sv_SE] Energy Storage for Commercial Buildings

Project Overview

When Luma Energy builds combined solar and battery systems for commercial buildings, high demands are placed on flexibility, speed and coordination. In several projects around Sweden, Melbye's foundation solution has been used as the basis for energy storage - with shorter installation times, increased safety and better control in the implementation.

The challenge

In one of the projects, property owner Catena Klippan AB needed battery storage to cut power peaks in an electricity market where prices fluctuate sharply every 15 minutes. The solution was a combined solar and battery system where stored energy is used when electricity prices are at their highest.

The project included everything from ground work to the finished installation of a 222 kW solar park and an energy storage of just over 300 kW. One of the biggest challenges was the deadline – as well as finding a safe and flexible solution for the foundation of the batteries.

The alternative considered was in-situ casting, but it involved both higher costs and risks related to uncertain cable routing and the exact design of the installation.

Our delivery

Melbye contributed with a comprehensive solution adapted to the project's tight schedule:

Melbye's contribution to the project
  • Foundation solution for energy storage
  • On-site support during installation
  • Fast delivery adapted to the project's tight schedule

Why our solution was chosen

Luma Energy chose Melbye's foundation solution because it was perceived as flexible , simple and cost-effective - especially compared to cast-in-place alternatives.

“We were faced with a major challenge with limited time and uncertainty around battery placement and cable routing. Casting in place felt risky and more expensive. Melbye’s solution gave us flexibility and security.”

- Anna Norling

Project Manager
 

Effect and benefit

  • Installation time was reduced to about a quarter of the estimated time
  • Easier adaptation to changes during installation
  • Positive response from both installers and ground contractors
  • Aesthetics and environmental performance were seen as an added bonus

The project was carried out in close dialogue between project management, designers and local contractors - something Luma Energy sees as an important part of creating security for both customers and end customers, as well as contributing back to the local market.

Via the Luma Portal app, the customer can also monitor how much the plant is producing in real time, while additional alarm and monitoring services allow Luma Energy to respond quickly to deviations.

Project status

Several facilities have been completed and are in operation. Additional projects are being planned on an ongoing basis, with Melbye's foundation solution considered a natural choice going forward.

Facts in brief

Several facilities have been completed and are in operation. Additional projects are being planned on an ongoing basis, with Melbye's foundation solution considered a natural choice going forward.

Products Foundation for energy storage
Delivery Part of a comprehensive solution for solar and battery systems
Effect Shorter installation time, increased flexibility and reduced project risk
Application Commercial buildings - energy storage and peak power cutting

ArticlesRelated articles

[sv_SE] Fire-rated optotubes and microtubes for safe indoor installations

[sv_SE] Fire-rated optotubes and microtubes for safe indoor installations

[sv_SE] In tunnels, hospitals, airports and other public environments, it is often the details behind the walls that determine how safe a building actually is in the event of a fire.

Read More arrow_right_alt
[sv_SE] The next generation of engineers on the road

[sv_SE] The next generation of engineers on the road

[sv_SE] When technology students build a solar car that will drive 3,000 kilometers through the Australian desert.

Read More arrow_right_alt
[sv_SE] Västmyrriset–Tuggen: A new link in the Swedish transmission grid

[sv_SE] Västmyrriset–Tuggen: A new link in the Swedish transmission grid

[sv_SE] When Vattenfall Service Nordic builds the new 170 kV line between Västmyrriset and Tuggen, Melbye supplies several of the supporting components.

Read More arrow_right_alt

Need help finding the right product?

Our experts are here to help you find the right solution for your project. Get in touch for product advice, support or a quote.

Get In Touch arrow_right_alt
Loading…
Loading the web debug toolbar…
Attempt #